Challenge

The platform had to handle twenty times more traffic than usual, which led to its complete shutdown. Our job was to bring the situation under control and the platform back to life as quickly as possible.

Results

We identified and fixed all critical points which directly affected the performance of the platform. We implemented a stronger buffering mechanism and adjusted the settings of all servers. After the platform was restarted, it was able to handle a traffic volume fifty times higher than the daily average.

Pride

16:00. The client reports a critical failure of their platform, caused by excessive traffic.
16:15. Our team of 5 starts its work in cooperation with 2 client’s developers.
20:00. The platform is back and running with a fifty times greater capacity.


References

5.0

Quality :

Schedule :

Cost :

Willing to refer :

5.0

5.0

5.0

5.0

image-2326

“Webini came to our aid and dealt with a critical issue that paralyzed our platform in, like, 4 hours from the time we reported the problem (on a Friday evening!) Do I recommend working with them? Definitely!”

Krzysztof Frejman
CEO